Loading... Please wait...Product Features
Product Details
| UL Listing: | Suitable for wet locations. Suitable for mounting within 4' of the ground |
| Housing: | One-piece die cast aluminum with die cast door frame held captive when opened |
| Reflector: | High quality anodized aluminum eliminates redirected energy to prolong lamp life. Contoured for maximum horizontal and vertical beam dispersion |
| Finish: | Chip and fade resistant polyester powder coating. |
| Lens: | Thermal, tempered shock resistant glass, 5/32" thick |
| Lens Gasket: | High temperature extruded silicone set in die cast retaining groove. Remains in place during relamping |
| Socket: | Porcelain socket pulse rate 4 KV, 1500 watts and 600 volts, reinforced with cat's eyes for added durability. Silicone and fiberglass #14 gauge socket leads rated for 200C. Plated screw shell designed to resist corrosion with spring loaded center contact. |
| EPA: | 4.2 |
| Pulse Start: | Pulse Start metal halide for increased lamp life, lumen maintenance, color uniformity and efficiency |
| Patents: | RAB sensor and fixture designs are protected under U.S. and International Intellectual Property laws |
| EISA 2007 Compliant: | This product complies with the new law for metal halide ballast efficiency. This law goes into effect January 1st, 2008. Pulse Start offers Longer Lamp Life, Faster Startup and Faster Restrike. |
| Country of Origin: | Designed by RAB in New Jersey and assembled in the USA by IBEW Local 3 |
| Buy American Act Compliant: | This product is a COTS item manufactured in the United States, and is compliant with the Buy American Act. |
| Recovery Act (ARRA) Compliant: | This product complies with the 52.225-21 "Required Use of American Iron, Steel, and Manufactured Goods-- Buy American Act-- Construction Materials (October 2010) |
| Trade Agreements Act Compliant: | This product is a COTS item manufactured in the United States, and is compliant with the Trade Agreements Act. |
| GSA Schedule: | This product is suitable for listing on the GSA Schedule of the US General Services in accordance with FAR Subpart 25.4 |